We'll show you every layer of your new roof.
We replace and repair roofs all around Kansas City. Before we cover anything up, we take a photo of it, and you get every one of them that same evening.
By the time anyone looks at your roof, most of it is already covered up.
-
The knock after the hail
You know the one. A crew from out of state shows up the week after a storm and works the whole street. By the time something leaks, the truck, the phone number and the warranty are long gone.
-
The one-line quote
"Replace roof: $14,800." That's all it says. Nothing about what's going on your roof or what bad decking will cost you, so the price climbs once the old shingles are off and it's too late to say no.
-
The parts nobody checks
The stuff that actually keeps you dry is buried by late afternoon. If it was done wrong, the first you'll hear about it is a stain on the ceiling.
Ever seen what's under your shingles?
Most people never do. This is a roof stripped down to the wood. Keep scrolling and we'll put it back together, just like we would on your house.
First, we take it down to bare wood
The old roof comes off, top to bottom, and we walk every sheet of decking. If a sheet is soft or water-stained, we swap it for a new one at the per-sheet price that's already on your quote, so there's no surprise bill. While we're up there, we cut a slot along the peak so your attic can breathe.
Then we seal up the edges
Edges are where water likes to sneak in. So a metal drip edge goes on along the bottom first. It sends rain into your gutter and keeps it off the wood behind. Over that we roll out two rows of ice and water shield, a sticky membrane that seals itself around every nail and stops ice dams from pushing water up under your shingles.
A raincoat for the whole roof
Next comes the underlayment, which works like a raincoat under your shingles. Each row overlaps the one below it by 4 inches, so any water that gets that far just runs downhill and off. Then the metal edging on the sloped sides goes on over the top.
Now the part you'll see: 34 rows of shingles
A starter strip seals the bottom edge, and then the shingles go on one row at a time. We stagger them so the seams never line up, and every shingle gets six nails, right on the nail line. Our crew lead checks each row before the next one covers it, because one nail set too high is how shingles end up in the yard after a storm.
When we reach a vent pipe or the chimney, the flashing goes in right then, tucked in with the shingles. We don't come back and caulk it on later.
Extra care around the chimney
Most of the leaks we get called out for start at a chimney, so this is where we slow down. We use copper here. There's a piece across the front, a small piece tucked in with every row of shingles up the sides, and a little peaked ridge behind the chimney, called a cricket, that sends water around it. The last layer gets cut right into the mortar so it laps down over everything else.
Last, we cap the peak
A vent along the ridge lets hot, damp air out of your attic. That's what keeps the wood dry and your shingles from baking in July. The cap shingles go on over it, overlapped so the wind slides across them and can't get underneath.
Then we clean up and send your photos
Before we leave, we go over your yard, flower beds and driveway with a magnet to pick up any loose nails. That evening, every photo from the job lands in your inbox. Most homes take us one day.
Book a free inspectionThe photos are yours to keep.
Our crew lead takes photos at every stage, and we send you the whole set the evening we finish. Hang on to them for your insurance company, your warranty, or whoever buys the house one day.

The old roof comes off 
Bare wood, checked sheet by sheet 
Underlayment goes down 
Shingles go on 
Flashing at the chimney 
Finished and cleaned up
A quote you can check line by line.
Everything you just watched go on gets its own line on your quote, with a number next to it. We price decking by the sheet before we start, so the total only changes if you say yes to the change.
This sample is for a 24-square ranch with one old layer to tear off. Yours will look a little different.
| Item | Amount |
|---|---|
| Tear-off, 1 layer, haul-away | 24 sq |
| Decking, only if needed | $78 per sheet |
| Drip edge, eaves and rakes | 212 lin ft |
| Ice and water shield, 2 courses | 124 lin ft |
| Synthetic underlayment | 24 sq |
| Starter strip | 124 lin ft |
| Architectural shingles, with waste | 26.4 sq |
| Chimney: apron, step, counter, cricket | Copper |
| Pipe boots | 3 |
| Ridge vent and cap | 42 lin ft |
| Permit, magnet sweep, photo record | Included |
| Workmanship warranty | 10 years, written |
If hail just hit your roof
Storms are stressful enough. Here's how we can help, and a couple of things we won't do.
We'll come take a look, free
Usually within two business days. We get up on the roof, mark every hit and take a photo of each one next to a scale. And if there's no real damage, we'll tell you that, too.
Filing a claim is your call
We'll show you what we found before you ever call your insurance company. Whether to file is up to you. It's your claim.
We'll be there when the adjuster comes
We meet them on the roof and walk them through what we found. We don't negotiate your claim, though. That part is between you and your insurance company.
You get one written scope
Our quote lists the same items your adjuster priced, so you can set the two side by side.
We won't "cover" your deductible
When a roofer offers to cover it, they're billing your insurance for a price you aren't really paying. We don't do that, and we'd steer clear of anyone who does.
How we can help

Roof replacement
We take it down to the wood and build it back up, one layer at a time. You get the photos and a 10-year workmanship warranty in writing.
Most homes: 1 day
Hail and wind repair
We'll inspect it for free and give you photos for your claim. If your shingles are still being made, we'll match them.
Free inspection
Leak repair
We track the leak back to where it starts, usually flashing, a pipe boot or a popped nail, and fix that. The stain on your ceiling is only where it ended up.
Usually same week
Impact-rated roofs
Class 4 shingles are built to take a beating from hail. Ask your insurance company if they give a discount for them before you pick.
UL 2218 Class 4
Gutters and downspouts
Seamless aluminum gutters, sized for your roof and hung so the drip edge empties right into them.
5 in. and 6 in.
Book a free inspection
Tell us what's going on and we'll call you to set up a time, usually within two business days. If you can snap a few photos from the ground, even better.
- Call or text
- (913) 555-0148
- Hours
- Mon to Fri, 7 am to 6 pm. Sat, 8 am to noon.
- Shop
- Lenexa, Kansas
- Service area
- Overland Park, Olathe, Lenexa, Shawnee, Leawood, Prairie Village, Merriam, Mission, Kansas City (Kansas and Missouri), Lee's Summit, Independence, Blue Springs, Raytown, Gladstone and Liberty.
Questions
How long will it take?
Most homes take us one day. A big or steep roof, or a lot of decking to replace, can push it to two. We'll tell you which before we start.
Do I need to be home?
Nope. We just need the driveway clear and an outdoor outlet. We'll text you when we start, around the halfway point, and when we're done.
What if it rains?
We only open up as much roof as we can get covered again that same day, and the underlayment is always down before we leave.
What does the warranty cover?
Our work, for 10 years, in writing. If it leaks or fails because of how we put it on, we come back and fix it. The shingle maker's warranty covers the shingles themselves, and that one is separate.
Do you use subcontractors?
No. It's our own crew on every roof, with a crew lead there the whole day.
Can you put new shingles over the old ones?
Code allows it sometimes, but we won't. We couldn't check the wood underneath, and we couldn't flash it properly.